Echelon i.LON SmartServer 2.0 Power Line Manual de usuario Pagina 115

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 144
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 114
i.LON SmartServer 2.0 Power Line Repeating Network Management Guide 101
b. The schedule for the selected weekday date shows the lower priority rush hour events
(priority 255) that are scheduled before the OFF event at sunrise (priority 220), and it hides
the lower priority rush hour events scheduled after the OFF event. The schedule also shows
the lower priority rush hour events that are scheduled to occur once the OFF event ends at
sundown and resets the data point priority to 255.
Vista de pagina 114
1 2 ... 110 111 112 113 114 115 116 117 118 119 120 ... 143 144

Comentarios a estos manuales

Sin comentarios